The landscaping has not started yet. Delayed a few days because of rain. But it should start tomorrow and the heavy equipment has already arrived.

Most of the house work is inside. They have been finishing up the trim. Here is what the trim looks like around the dining room windows.

And here is trim around the mirror (not installed yet) and window in the master closet.

The master bathroom vanity has been installed. Drawers will be installed later. They have measured for the counter top so that will be cut and installed soon.

Upstairs, they have been finishing up the closets. This is the linen closet on the second floor.

The first section of the game room cabinetry (and Murphy bed) has been installed. We decided that we need to add a piece of trim at the top. The floating shelves will be added next.

In the living room, they has started installing the slats, actually starting with the acoustic panel backing which will be behind the slats.

Finally, upstairs the flooring has been delivered and is piled up in the various rooms. It will be installed soon, except for the family room, where they still need to access the first floor ceiling from above to wire up the lights.

It will be two more weeks before we determine whether we can meet the end of August date for the occupancy permit. Fingers crossed.