New Progress Diagrams Posted

A quick status update. This month (October) is focused on preparing for getting approval from the Concord Natural Resources Commission. Approval is required because the house is within 100′ of the wetlands. In advance of the meeting, we are looking into moving the septic system (test holes all look good) and mitigating the removal of trees that will be impact by the build, by proposing new plantings.

At the same time we are getting a design ready to discuss with possible builders. Hopefully, we will have those discussions within a month and have a builder selected before the end of the year.

In the meantime, look, windows! This is a rendering of the river-facing side of the house with possible window locations. I have posted a series of architectural summary drawings here: Sudbury River House.

Total Views: 121 ,

1 Comment

  1. XRmah

    Hello!

    Good cheer to all on this beautiful day!!!!!

    Good luck 🙂

Leave a Reply

Your email address will not be published. Required fields are marked *

© 2024 Gould Home

Theme by Anders NorenUp ↑