First I will update you on the occupancy permit process. We have successfully passed all the necessary inspections. Two documents need to be given to the building inspector on Monday morning, and he will turn around the occupancy permit by end of day Monday. Tuesday, we move in.

Let me show you progress pictures. First they fit the electric oven into the cabinet by widening the opening.

Outside, they put gravel on the walkway, which is only temporary until the landscaping is done. The gravel will keep the movers from tracking dirt into the house.

On the second floor, we positioned and then had them install, the pull up bar. It is positioned for Daphne and me. Tall people may find it mounted too low.

The media consultant finished their installation. Here is the living room TV and sound bar.

Here is the second floor wiring closet where we have an Ethernet switch.

And here is the main rack with an Ethernet switch and the doorbell and camera equipment.

The plumber has installed the water softener.

I do not know how to use any of these things, but I will be trained in the coming week.

I forgot to get a picture of the new garage epoxy floor, which will be drying until Monday. Inside the house, on Saturday, they will put the final coat of finish on the hardwood floor and stairs. On Monday, the construction crew removes all their equipment. The dented appliances get replaced on Tuesday, the same day that the movers arrive.