Right now, inside the house, a crew is putting up blue board on the walls and ceilings. They have finished the second floor and are partway though the first floor. Once the blue board has been installed, they will start plastering.

The crew uses stilts, especially when working on the ceiling installation. Here is a picture of two workers in the living room.

Here are workers in the first floor hallway.

The second floor has all the panels installed. Here is the guest bedroom (2nd floor).

And here is the family room (2nd floor).

In the living room, they have installed wood where the decorative slats will go.

Plastering should start tomorrow or the next day, once all the blue board has been installed.