This past weekend, we went to the house to document every wall and ceiling before they get insulated and plastered. This way, we will know inside every wall, where the studs are, where the wires run and where the pipes run.

Daphne and I together took 283 pictures. Here is one example.

Having done that, the builder can proceed with the installation of insulation. We are having a blown-in foam insulation in the walls and under the roof. It is very effective and easy to install, especially when there are a lot of wires in the walls that would normally make it harder to install rockwool or fiberglass.

Work is starting in the garage. Here is the truck.

I held the camera inside the plastic sheeting (without going in myself) and captured this picture of the insulation that was put in place yesterday and today.

This work will continue for a week or two. During the work, the house will be off limits (to me at least) because of the fumes. Once it is done, then they will start to install the plaster board, walls and ceilings.

I will have no videos of the insulation installation since it would likely screw up the camera lens. But we will try to take some interior videos once the walls start to go up.

Current estimated occupancy date: July 31, 2026 (no change).