And I am not referring to the house progress. The following picture shows our view of the river on March 7th.

And here is that same view seven days later. As you can see the water is now very high because of all the melting snow in the watershed.

We also had a wind storm in the last week and lost a bunch of branches from one of our pine trees. We will have to deal with these soon.

Meanwhile, inside the house we are preparing for the electrical system testing this coming week. They have added shielding on the pantry floor, which shields the basement electrical room from the living space.

And in preparation of testing, I have assembled a bunch of window air conditioners and space heaters to provide electrical load for the testing. These will be plugged in to the various circuits.

Finally here is a picture of the frames for the speakers, and their wiring, that will be in the game room. The speakers will be added later.

I am not visiting the house until next weekend, although if the builder sends me any interesting pictures, I will post them.