First we have more work on the siding. Here is what the front of the house looks like right now.

And they have finished up the back of the garage as you can see here.

They still need to add the black trim at the top, but I assume that will come later. All the trim pieces are sitting inside the house right now.

I have a construction video showing the siding of the front of the house (up to this point). If they keep working on the front next week, I will extend the video. At the end of the video, they are installing a vent on the second floor with the cherry-picker. I am sorry about the length (4 mins) and the fact that some days are blurred with moisture.

The electrician was snaking guide wires through all the conduits. Here are pictures from the north side of the garage (one end) and from the electrical room (the other end). The electrical room was dark so the picture quality is poor. But it looks like all the lines are labeled.

And there is more wiring in place in the garage. Those large black cables in front come from the generator.

Finally, to close out this post here is another view of the house from across the river.