Another couple of hours pulling invasives. We are now working in the afternoon since temperatures have dropped. Here you can see Daphne pulling out Japanese Honeysuckle.

The siding is delayed, but other work continues. The deck got its first coat of fire retardant paint today. Yes, the painter was working on Saturday.

Last week the electrician was mostly working in the garage. Here is north side of the garage where the power meter and main shutoffs will go.

And here is the other side of that wall. There will be a sub-panel in the garage, and two of them in the basement.

But most of the activity was the installation of the heating units and the duct work. Here is a picture of the three air handling units in the basement – one for the first floor, one for the basement and one for the master bedroom (horizontal). The second floor air handling unit goes into the attic and is still waiting to be installed. You can also see the basement wall insulation panels which will eventually be install on all the basement walls.

Finally, here is this week’s construction video which only covers the second half of the week (when I moved the construction camera into the basement). Next Wednesday, the camera will move outside again to catch the start of siding.

Leave a Reply