We have been forced to hire an asbestos mitigation firm to remove the asbestos in the house before it is demolished. The asbestos removal is necessary since any material that includes asbestos needs special disposal, and if it was left in place during demolition, not only would there be a risk of releasing a lot of asbestos into the air, but the debris from the entire house would need special disposal.

The asbestos remediation team has been working in the house for over a week. They took two days off while the tree removal was ongoing, but now they are back and they have moved a dumpster into place to hold the removed material.

I guess it was convenient that we removed the trees and rhododendrons to make room for that dumpster. Although, I liked the look of the greenery better than the look of that black box.