Its Saturday, so back to the house for a visit. We are past the invasive plant removal season, but we still want to check the house every week. We also had to inspect the proposed ironing board (which we rejected) and plan the spacing for the house numbers (which we did).

While I was there, I grabbed the construction camera memory card and stitched together the following video of the last few weeks of siding installation. The siding is not done, but it installation has paused until more mounting hardware arrives. As with the previous siding video, this video is sped up a lot to keep it brief. Some of the work was on the north side of the house so while you can see the cherry picker, you can’t see the panels in the video.

Now that you have watched the video, here is the end result, showing the current siding on the east (river) side and north side.

In the second picture, you can see the start of the vertical slats that will hide the area under the deck. The crew will work on installing those while they wait for the siding mounting hardware. I moved the construction camera to better focus on this work.

Meanwhile, inside the house electrical work continues. Here the the current electrical room where you can see all the new wires that have been installed and await connections to the sub-panel.

Hopefully, the exterior doors show up early next week and can get installed quickly. (The current doors are all temporary).

Total Views: 120