Siding installation continues. Here is the current view of the front of the house.

And here is the dining room siding seen from the deck. I am sorry for the angle; I was as far back as I could get without falling off the deck.

Inside the house, electrical work continues. Here is the master bathroom seen from the foyer. Lots of wires. The temporary furnace was running so the house was 50 degrees inside.

We are still collecting lights. We drove our fourth load of lights to the house this morning. Here is the current pile in the basement.

Finally I have a treat for you. Here is a construction cam video showing the siding of the front of the house over two plus weeks. I have sped up the video a lot so that it is only 30 seconds long.