Lots of people working at the house today. In the basement they were installing the temporary heater that will keep the house warm while they work over the winter. Meanwhile, they are working on the siding on two different walls (front and south side). Here is a picture of the south side of the house (master bedroom wall). The little square in the lower-left corner of the siding is where there will be an exterior faucet.

Total Views: 91