Thursday, the construction crew restarted the installation of the siding. It is supposed to take the rest of the year, but progress is visible. Here is a picture of the north side of the garage (with the electrical panels), and the east side of the garage (which is not finished yet). Notice that the peaks will be in a different color (not green).

I caught the action on the construction camera and here is the cropped video. In the video, you can also see some more work on painting of the deck framing.

Meanwhile, on Sunday, we went to the house and placed strings between the posts in the backyard. This divides the area into squares.

Then Daphne sprinkled seeds onto the ground according to a plan, which is shown below. With luck, some of these will sprout in the spring.

Finally, I have moved the construction camera to the front, where work will be done next week (I hope).