No more invasive plant removal for us for the rest of the year, but we did visit the house to get an update on the construction.
Here is the first section of siding. They have not tackled the complex area where the electrical conduits are located.

And here is our generator. It is still missing the connection to the gas and to the electrical system.

And here is a video showing the installation of these two new house features.
The water level of the river is up and the leaves are coming down as you can see in this picture.

Finally, we are going to try to get a bid from a domestic cabinet manufacturer given the tariff uncertainty. Hopefully we can get that bid before we commit to the current choice (which is Canadian).