Today features light drizzle, and the same was predicted for the rest of the week. This means that filling in the trench has been delayed until Monday (unless the forecast for Friday changes). Meanwhile, I did go around to the north side of the garage to see where all the conduits come up, as shown below.

Meanwhile, the electricians have moved into the basement where they are installing the main panels. Here is a picture of them working in the area just above all the conduits.

There was also some work on the outside stairs down from the deck, although that work is not finished yet. As soon as it is finished, they will add the fireproofing coating to the deck framing.

At our Wednesday meeting we had the tile installer come by to measure the bathrooms so we know how much tile to order. We (meaning Daphne) picked the color we will use for the lattice work under the deck and under the porch. Friday we go to the showroom where we will select our counter top and given them a deposit before they raise their prices by 15% on October 1st.

Siding has been delayed a week so it will not start next week, but rather the week after. Meanwhile, the HVAC installers are still putting in ducts. I suspect they will be working for another week or two. The duct work has caused us to relocate some of the ducts in the basement reducing the ceiling height in a section near the basement door by a foot (it will still be over seven feet).