I just got this update from the builder. Today they have been cutting holes in the foundation for the various vents. For example, here is a brief movie showing the cutting of the opening for the make-up air vent.

And here is what the opening looks like when he was done cutting.

We will have a lot of pipes going from the utility room to the garage. That’s because we are putting the main power panel as well as the power meter and water meter on the far side of the garage. We are also wiring the garage for Ethernet and for a temperature alarm. Here is the bank of holes that were cut into the back of the foundation, in the utility room. Many of these will get a pipe running underground to the garage or to the street (for example, for the fiber internet).