As of Wednesday morning, every interior wall has been framed except the wall between the bathroom and the game room. I assume by the time you read this, that wall will be finished. In addition, the porch is partially framed. Also, they dug out the place for the garage foundation.

Here is an interior picture. This was taken at the front door looking at the front hall. You can see the stairs up the second floor on the left side and the living room wall just past the stairs. Going from the stairs towards the right are the guest bathroom, the place where there will be stairs down to the basement, and the laundry room. Across from the laundry room (against the front of the house) is the front hall closet.

Here is the river side of the house showing the progress on the porch. Our neighbor has been trying to convince us that we do not need screens, but after discussing it with the builder and architect, we are going to stick with built-in screens. Making them removable would add more cross bars and shrink the windows a little.

Finally, here is the garage location. You can see they have dug out the place where the foundation will be added.

There will be no construction camera videos this week because if the dreaded SD card error (I have thrown out that memory card, but I have been getting a lot of those errors.) There will also be no weekend update because of the long weekend.

Total Views: 142