Air quality is bad this weekend so no invasive pulling and no kayaking. I did, however, visit the site to take some pictures and fetch the construction camera video.

Here is the current state of the house from the usual locations. (Sorry about the glare from the early morning sun.) All of the first floor exterior walls are up (but not all covered with green panels), and most of the exterior walls from the second floor are now in place.

And here is an interior picture of the second floor. I was standing in what will be the closet of the front bedroom. The large window opening is at the river side of the family room. The smaller openings in the far corner are from the back (and nicer) guest bedroom.

And here is a view of the house from the river side.


The water level in the river has fallen by quite a bit, exposing swaths of mud that will soon be overgrown with greenery.

Finally, I have two and a half days of construction video showing the work on the second floor, but also the installation of the water pipe, which goes from the road into the basement.

Total Views: 240