I made a quick trip to the building site and took the following two images of the current foundation walls.

This first picture is the river side where the basement door will be placed. You can see that the block has been removed. You can also see a red line on the foundation on both walls, near the bottom of the opening. This red line is the top of where the seal coating will be applied later this week.

Here is another view, this time from the corner near the driveway. Once again you can see the red line for the seal coating. After the coating dries, we will back fill in the dirt to bring the ground level to approximately 4 inches above the red line. This will give you some sense of how much of the foundation you will actually see. That said the near side in this second image will be hidden by the deck.