The builder emailed this picture to me this afternoon. It shows them starting on the footings for the house. Concrete for the footings will be poured on Friday.

This work should all be visible from the construction camera’s new location (which is a tree near the top-center of this picture). I will try to get the memory card this weekend, if there is a break in the rain.

This is just the footprint of the house. The garage will be done much later in the build process since the old garage foundation is being used for access and staging. The deck and porch do not have foundations, just pillars. I assume those can be added later. The part that juts out to the right side is the front stoop.

Total Views: 4