Its springtime and the river is up. Here is a panorama of our waterfront taken today.

Meanwhile demolition and site preparation continues. First, up is the garage. This is what is left of the garage. It will be rebuilt, although probably after the house is framed since that will give the equipment another angle of site access.

The house itself is a shell of its former self. The walls have been removed (asbestos), the electrical wiring has been removed (and will be recycled), the plumbing has been removed (and will also be recycled). The appliances and the kitchen cabinets have been removed and were taken by a neighbor to be used in a renovation. And the windows have been removed (but not recycled).

Here are two pictures from the house, basement and main level. The rakes and other yard items were in the garage.

Actual demolition of the house will probably happen at the end of next week. After that, I will put up a story page with construction videos (I already have a video of the window removal and the garage demolition).

Total Views: 16