We met with the architect again and I wrote another story page about it. Check out What is a Few Inches Between Friends.
In other news, our builder is back in town and will meet with the arborist today and then meet with our architect. We have been nailing down some more design details so a packet can be put together to submit to the town so we can get a building permit.
Current schedule, which is subject to change, is to try to demolish the existing house in April or earlier if the ground is not frozen (we should have the building permit in March). Then construction is estimated to be 14-16 months. With luck, we will be moving in by the end of the summer in 2026.
Leave a Reply