It has been a little while since my last house post, but things have not been idle. Most of the work right now is being done by the site engineering firm.

First, the engineering firm took the proposed house placement and measured the elevation. This impacts how tall the house can be, and as I mentioned in an earlier post, we are forced to reduce the height of the roof by a few feet to meet town building heights limits. This has forced us to change the second floor a little to have some sloping walls. You can see the details at the end of this story page.

Mostly, however, we are waiting for the engineering firm to propose a new location for the septic system. This involves drilling a few test holes and doing a perc test to check for suitability. There is an existing septic system, and we can use that, but it is actually in the wetlands zone (grandfathered location) and we believe that moving it out of the wetlands will make the Natural Resources Commission more likely to approve the rest of our plans.

One of the problems with the new house is the need to remove some trees. Four large trees (yellow) definitely have to come down since they otherwise would be inside the new house. Three more trees may need to be removed since their roots will be disturbed. When removing trees, the Natural Resources Commission is likely to demand offsetting plantings. Because of this, we are also starting to discuss what additional planting we will be proposing (nothing that blocks the view, however).

We were just out to visit the property again and noticed that Dig Safe has come by and marked where the town water line runs. I also believe I saw some flagging near the road marking the property line. So progress is being made, slowly.

Here is a picture of Daphne scouting out a route to reach the river. We really want to be able to launch a boat from our own property, but there is a lot of vegetation between the house and the river, and a lot of muddy ground as well. The river level also changes a lot during the year. But we are legally allowed to have an unimproved dirt path through the wetlands, so we have been starting to plan for this.

Finally, I have added some more more photographs to my On the Sudbury River gallery.